A new eight-kilometer road is under construction that links the port area with motorway system. It is expected to carry 20,000 trucks and cars a day, which greatly reduces the overcrowded traffic in the center of the city. As part of the project, two four-kilometer road tunnels are being built below the central area of the city, one for traffic to the north and the other for the traffic to the south. The two tunnels are about 20 meters below the surface and are 12 meters wide, providing for two lanes of traffic in each direction. 

   In the upper part of the tunnel two air-conditioning pipes remove the waste gas of trucks and cars and keep the quality of air inside the tunnel. The lighting is at the top of the tunnel, practically at its highest point. There will also be electric signs at frequent intervals. They show traffic conditions ahead and can be seen clearly by drivers. The wall is made up of four main elements, which include a waterproofing covering and, on the inside of the tunnel, a concrete lining(混凝土襯砌).

   Each tunnel is roughly round and the lower part of the tunnel is somewhat flat. The surface of the road lies on the base, which is made of concrete and steel. The drainage system, just below the road surface on one side, removes any extra liquid, particularly water. In the event of fire, the fire main, which is made of steel, pipes water to many fire hydrant stations at regular intervals along the length of the tunnel. The fire main is at the side of the tunnel and at the level of the road surface. Other systems in the tunnel will include emergency phones.

1. Each of the tunnels under construction is _____.

   A. eight kilometers long and twenty meters wide

   B. eight kilometers long and six meters wide

C. four kilometers long and twenty meters wide

   D. four kilometers long and six meters wide

2. Which part of the tunnel in the diagram is used to pipe out extra water?

   A. 1           B. 3            C. 5               D. 6 

3. Driving in the tunnel, one can know the traffic conditions ahead through______.

  A. the lights                             B. the electric signs    

C. the trucks and the cars                 D. the emergency phones

4. The passage is mainly about _____.

 A. the construction of a road            B. the design of a road  

   C. the construction of two tunnels        D. the design of two tunnels

練習(xí)冊(cè)系列答案
相關(guān)習(xí)題

科目:高中英語(yǔ) 來(lái)源: 題型:閱讀理解

  A new eight-kilometer road is under construction that links the port area with motorway system. It is expected to carry 20,000 trucks and cars a day, which greatly reduces the overcrowded traffic in the center of the city. As part of the project, two four-kilometer road tunnels are being built below the central area of the city, one for traffic to the north and the other for the traffic to the south. The two tunnels are about 20 meters below the surface and are 12 meters wide, providing for two lanes of traffic in each direction. 

   In the upper part of the tunnel two air-conditioning pipes remove the waste gas of trucks and cars and keep the quality of air inside the tunnel. The lighting is at the top of the tunnel, practically at its highest point. There will also be electric signs at frequent intervals. They show traffic conditions ahead and can be seen clearly by drivers. The wall is made up of four main elements, which include a waterproofing covering and, on the inside of the tunnel, a concrete lining.

   Each tunnel is roughly round and the lower part of the tunnel is somewhat flat. The surface of the road lies on the base, which is made of concrete and steel. The drainage system, just below the road surface on one side, removes any extra liquid, particularly water. In the event of fire, the fire main, which is made of steel, pipes water to many fire hydrant stations at regular intervals along the length of the tunnel. The fire main is at the side of the tunnel and at the level of the road surface. Other systems in the tunnel will include emergency phones.

Each of the tunnels under construction is _____.

   A. eight kilometers long and twenty meters wide

   B. eight kilometers long and six meters wide

C. four kilometers long and twenty meters wide

   D. four kilometers long and six meters wide

Which part of the tunnel in the diagram is used to pipe out extra water?

   A. 1           B. 3            C. 5               D  6 

Driving in the tunnel, one can know the traffic conditions ahead through______.

  A. the lights                    B. the electric signs    

C. the trucks and the cars          D.  the emergency phones

The passage is mainly about _____.

   A. the construction of a road           B. the design of a road  

   C. the construction of two tunnels      D.the design of two tunnels

查看答案和解析>>

科目:高中英語(yǔ) 來(lái)源: 題型:閱讀理解

   A new eight-kilometer road is under construction that links the port area with motorway system. It is expected to carry 20,000 trucks and cars a day, which greatly reduces the overcrowded traffic in the center of the city. As part of the project, two four-kilometer road tunnels are being built below the central area of the city, one for traffic to the north and the other for the traffic to the south. The two tunnels are about 20 meters below the surface and are 12 meters wide, providing for two lanes of traffic in each direction. 

   In the upper part of the tunnel two air-conditioning pipes remove the waste gas of trucks and cars and keep the quality of air inside the tunnel. The lighting is at the top of the tunnel, practically at its highest point. There will also be electric signs at frequent intervals. They show traffic conditions ahead and can be seen clearly by drivers. The wall is made up of four main elements, which include a waterproofing covering and, on the inside of the tunnel, a concrete lining(混凝土襯砌).

   Each tunnel is roughly round and the lower part of the tunnel is somewhat flat. The surface of the road lies on the base, which is made of concrete and steel. The drainage system, just below the road surface on one side, removes any extra liquid, particularly water. In the event of fire, the fire main, which is made of steel, pipes water to many fire hydrant stations at regular intervals along the length of the tunnel. The fire main is at the side of the tunnel and at the level of the road surface. Other systems in the tunnel will include emergency phones.

72. Each of the tunnels under construction is _____.

   A. eight kilometers long and twenty meters wide    B. eight kilometers long and six meters wide

   C. four kilometers long and twenty meters wide     D. four kilometers long and six meters wide

73. Which part of the tunnel in the diagram is used to pipe out extra water?

   A. 1           B. 3            C. 5               D  6 

74. Driving in the tunnel, one can know the traffic conditions ahead through______.

  A. the lights                    B. the electric signs    

  C. the trucks and the cars          D.  the emergency phones

75. The passage is mainly about _____.

   A. the construction of a road                         B. the design of a road  

   C. the construction of two tunnels           D.the design of two tunnels

查看答案和解析>>

科目:高中英語(yǔ) 來(lái)源:2013-2014學(xué)年江西省臨川一中高三上學(xué)期聯(lián)考英語(yǔ)試卷(解析版) 題型:單項(xiàng)填空

---Has anything caught your eye in today’s newspaper?

  ---Yes. A new eight-kilometer-long road is under ________ that links the port area with the motorway system.

A. consideration     B. construction   C. conservation   D. constitution

 

查看答案和解析>>

科目:高中英語(yǔ) 來(lái)源:2011-2012學(xué)年安徽省滁州市高三考前模擬英語(yǔ)試卷(解析版) 題型:單項(xiàng)填空

---Has anything caught your eye in today’s newspaper?

---Yes. A new eight-kilometer-long road is under ________ that links the port area with the motorway system.

A.consideration

B.construction

C.conservation

D.constitution

 

查看答案和解析>>

科目:高中英語(yǔ) 來(lái)源: 題型:閱讀理解

 (06·江蘇E篇)

A new eight-kilometre road is under construction that links the port area with the motorway system . It is expected to carry 20,000 trucks and cars a day, which greatly reduces the overcrowded traffic in the center of the city . As part of the project , two four-kilometre road tunnels are being built below the central area of the city , one for traffic to the north and the other for traffic to the south .The two tunnels are about 20 metres below the surface and are 12 metres wide , providing for two lanes of traffic in each direction .

In the upper part of the tunnel two air-conditioning pipes remove the waste gas of trucks and cars and keep the quality of air inside the tunnel . The lighting is at the top of the tunnel , practically at its highest point . There will also be electronic signs at frequent intervals (間隔). They show traffic conditions ahead , and can be seen clearly by drivers . The wall is made up of four main elements , which include a waterproofing covering and , on the inside of the tunnel , a concrete lining (混凝土襯砌).

Each tunnel is roughly round and the lower part of the tunnel is somewhat flat .The surface of the road lies on the base , which is made of concrete and steel  The drainage system (排水系統(tǒng)), just below the road surface on one side , removes any extra liquid , particularly water . In the event of fire , the fire main , which is made of steel , pipes water to many fire hydrant stations at regular intervals along the length of the tunnel . The fire main is at the side of the tunnel , and at the level of the road surface . Other systems in the tunnel will include emergency phones .

72.Each of the tunnels under construction is       .

       A.eight kilometers long and twenty metres wide

       B.eight kilometers long and six metres wide

       C.four kilometers long and twenty metres wide

       D.four kilometers long and six metres wide

73.Which part of the tunnel in the diagram is used to pipe out extra water ?

       A.1.                           B.3.                           C.5.                           D.6.

74.Driving in the tunnel , one can know the traffic conditions ahead through        .

       A.the lights                                                   B.the electronic signs

       C.the trucks and cars                                    D.the emergency phones

75.The passage is mainly about        .

       A.the construction of a road                           B.the design of a road

       C.the construction of two tunnels                   D.the design of two tunnels

查看答案和解析>>

同步練習(xí)冊(cè)答案